March 18, 2026Instruments0 citationsOpen Access

Return of Experience in the Commissioning of the New CLS LINAC Injector

View Full Paper
FPFrédéric Le PimpecWWWard WurtzJVJ. Vogt

Key Points

  • To share insights on the commissioning process of a new LINAC injector at the Canadian Light Source and the challenges faced.
  • Implemented new designs based on existing RF technology from RI Research Instruments.
  • Replaced six short RF structures with three longer structures to optimize space and cost.
  • Utilized a SLED system for efficient power distribution from klystron modulators.
  • Successfully delivered a 250 MeV electron beam with new accelerating structures.
  • Identified and addressed various commissioning challenges during the integration.
  • Current performance of the injector aligns closely with technical specifications.

Abstract

After approximately 60 years of service, the 2856 MHz LINAC injector, of the Canadian Light Source (CLS), has been retired to make space for a new 3000.24 MHz LINAC injector, the frequency of which is a multiple of the 500.04 MHz CESR-B-type superconductive radio frequency cavity used in the CLS storage ring. The new CLS LINAC injector has been designed and built by RI Research Instruments GmbH. The design is based on their robust S-band RF traveling-wave accelerating structures technology already serving other laboratories in the USA, Australia, Taiwan, Switzerland, and Sweden. In order to reduce cost and optimize space, the CLS has replaced its six accelerating RF structures, each 3.05 m long, delivering a 250 MeV electron beam with three 5.26 m long accelerating structures that will deliver the same beam energy. In order to do so, one RF structure is powered by one klystron modulator, and the last two RF structures receive their RF power from a second klystron modulator that passes through a SLED system. The SLED system multiplies the peak power by a factor of 5 to 6 and is then equally split to power each structure. We are reporting on the issues encountered during the commissioning of this new injector, on how we have tackled them and where the injector, compared to its technical specification, is standing today.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Pimpec et al. (2026) studied this question.

synapsesocial.com/papers/69ba43984e9516ffd37a5036https://doi.org/10.3390/instruments10010017