PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
April 10, 2026Computers and Geotechnics0 citationsOpen Access

Long-term performance of high-fill box culverts with geogrid-expanded polystyrene load reduction system

View Full Paper
BCBao-Guo ChenGRGuoqing RenDSDing-Bao Song

Key Points

  • The aim is to understand the long-term performance of high-fill box culverts using the geogrid-EPS system under varying conditions.
  • Conducted model tests to assess stress characteristics during construction.
  • Utilized a validated finite differential model for post-construction analysis.
  • Performed parametric analyses on geogrid-EPS parameters affecting performance.
  • Found significant redistribution of earth pressure over time due to material creep.
  • Vertical pressure at the culvert crown decreased significantly, while horizontal sidewall pressure increased.
  • Lowering EPS modulus notably reduced crown pressure but heightened sidewall pressures, manageable through layer spacing adjustments.

Abstract

The Geogrid-Expandable Polystyrene System (GES) is widely employed in high embankments to alleviate backfill loads on buried structures such as box culverts, particularly in mountainous regions. However, the long-term performance of high-fill box culverts incorporating this system remains poorly understood. In this study, model tests were performed to examine the stress characteristics of a high-fill box culvert with geogrid-EPS during embankment construction. A validated finite differential model was subsequently used to investigate the post-construction long-term behavior, including EPS deformation, geogrid tensile forces, and earth pressure evolution around the culvert. Parametric analyses were conducted to assess the influence of key geogrid-EPS parameters on long-term performance. Results indicate significant long-term redistribution of earth pressure due to creep in both the geogrid and EPS geofoam. Vertical earth pressure at the culvert crown decreases progressively, while horizontal pressure on the sidewalls increases gradually. Foundation contact pressures remain relatively stable, with increases of only 5.9% and 0.6% at the monitored locations over 600 months. Long-term load reduction is highly sensitive to the elastic modulus and thickness of EPS geofoam as well as the tensile stiffness of the geogrid. Reducing the EPS modulus from 5 MPa to 1 MPa lowers crown pressure by 37.7% at the end of construction and by 47.4% after 600 months; however, it also elevates sidewall pressures, which can be effectively controlled by optimizing the vertical spacing of geogrid layers.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Chen et al. (2026) studied this question.

synapsesocial.com/papers/69d894526c1944d70ce05410https://doi.org/10.1016/j.compgeo.2026.108127
Ask AI
Helpful
Bookmark
Share
View Full Paper