PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
February 1, 2000Technometrics799 citations

Ridge Regression: Biased Estimation for Nonorthogonal Problems

View Full Paper
AHArthur E. HoerlRKRobert W. Kennard

Key Points

Key points are not available for this paper at this time.

Abstract

In multiple regression it is shown that parameter estimates based on minimum residual sum of squares have a high probability of being unsatisfactory, if not incorrect, if the prediction vectors are not orthogonal. Proposed is an estimation procedure based on adding small positive quantities to the diagonal of X′X. Introduced is the ridge trace, a method for showing in two dimensions the effects of nonorthogonality. It is then shown how to augment X′X to obtain biased estimates with smaller mean square error.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Hoerl et al. (2000) studied this question.

synapsesocial.com/papers/69d8aca1ce048d2571bedb9ehttps://doi.org/10.1080/00401706.2000.10485983
Ask AI
Helpful
Bookmark
Share
View Full Paper