PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
April 17, 2026Scientific Reports1 citationsOpen Access

Geomechanical performance of a novel L-shaped wellbore design for hot dry rock geothermal reservoirs: insights from fully coupled thermo-hydro-mechanical modeling

MKMohammad Aliakbari KhoeiAPAli Pak

Key Points

  • Evaluate the performance of a novel L-shaped wellbore design for enhanced geothermal systems through modeling.
  • Developed a fully coupled three-dimensional thermo-hydro-mechanical numerical model.
  • Conducted sensitivity analysis on various parameters like injection pressure and temperature.
  • Compared the novel design's performance against conventional systems.
  • Increased stable production period from 2.6 years to 6 years.
  • Doubled reservoir lifetime from 6.3 to 12.4 years compared to vertical systems.
  • More than doubled thermal power output.
  • Extended sustainability beyond 20 years with reduced injection pressure.

Abstract

Enhanced Geothermal Systems (EGSs), developed to extract heat from hot dry rock (HDR) formations, are promising renewable heat resources; however, their long-term performance is governed by coupled thermo-hydro-mechanical (THM) processes. This study introduces a novel L-shaped injection-production wellbore configuration designed to enhance reservoir contact while reducing drilling complexity compared to conventional vertical, multilateral, and closed-loop systems. A fully coupled three-dimensional THM numerical model is developed to evaluate its performance, accounting for conductive-convective heat transfer, pore-pressure evolution, and thermally induced deformation. A sensitivity analysis investigates the effects of horizontal wellbore length, injection pressure, injection temperature, rock thermal expansion coefficient, and fluid compressibility. Extending the horizontal section increases the stable production period from 2.6 to 6 years and doubles reservoir lifetime from 6.3 to 12.4 years compared to a quintuplet vertical system, while delivering more than twice the thermal power output. Reducing injection pressure from 10 to 5 MPa suppresses cold-front migration and extends sustainability beyond 20 years. Increasing injection temperature from 323.15 to 343.15 K raises lifetime from 11 to 12.4 years but reduces power by 20%. The results demonstrate that the proposed configuration provides a balanced solution between thermal efficiency, mechanical response, and operational simplicity for HDR development.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Khoei et al. (2026) studied this question.

synapsesocial.com/papers/69e1ce895cdc762e9d857893https://doi.org/10.1038/s41598-026-47582-8
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1A review of borehole thermal energy storage and its integration into district heating systems2023 · 131 citations
  2. 2Uncertainty analysis of thermo-hydro-mechanical coupled processes in heterogeneous porous media2009 · 148 citations
  3. 3Stress-Dependent Permeability: Characterization and Modeling1999 · 116 citations
  4. 4A coupled thermo–hydro-mechanical–chemical model for underground cemented tailings backfill2015 · 116 citations
  5. 5Numerical study on the effects of thermoelastic and poroelastic parameters on the geomechanical behaviour of Hot Dry Rock geothermal reservoirs2023 · 10 citations