PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
April 25, 2026Computers, materials & continua/Computers, materials & continua (Print)0 citationsOpen Access

Hybrid Flow Shop Rescheduling Approach Based on Hybrid-Driven Mechanism and Improved Multi-Objective WOA

FLFeng LvHenan University of Science and TechnologyXXXin XuHenan University of Science and TechnologyCYCheng YangHenan University of Science and Technology

Key Points

  • The aim is to develop a rescheduling method to enhance production continuity and efficiently manage disturbances in hybrid flow shops.
  • Constructed a rescheduling model minimizing makespan, total tardiness, and scheme deviation.
  • Designed a hybrid driving mechanism utilizing latest completion time for triggering rescheduling.
  • Enhanced Whale Optimization Algorithm by integrating point set theory, nonlinear control, and Differential Evolution.
  • Demonstrated improved multi-objective optimization capability with IMOWOA.
  • Verified effectiveness through comparative and ablation experiments.
  • Generated practical rescheduling scheme benefiting agricultural machinery production line.

Abstract

To ensure an effective disturbance response and maintain continuous production in hybrid flow shops, this paper focuses on the design of a rescheduling method. A rescheduling model is constructed that minimizes the makespan, total tardiness, and scheme deviation degree. A hybrid rescheduling driving mechanism based on the latest completion time is designed to effectively trigger rescheduling. The Whale Optimization Algorithm (WOA) is improved by integrating the good point set theory, nonlinear control parameter strategy, and Differential Evolution (DE) algorithm. Moreover, non-dominated sorting and a dynamic external archive mechanism based on crowding distance are introduced to make it suitable for multi-objective optimization problems. The superiority of the Improved Multi-objective Whale Optimization Algorithm (IMOWOA) and the effectiveness of the improved mechanisms are verified through comparative experiments and ablation experiments. Taking the final assembly production line of an agricultural machinery equipment enterprise as an example, a rescheduling scheme is generated based on the practical production requirements, which verifies the feasibility and effectiveness of the proposed method.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Lv et al. (2026) studied this question.

synapsesocial.com/papers/69ec5b6088ba6daa22dace0dhttps://doi.org/10.32604/cmc.2026.079917
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1A hybrid whale optimization algorithm for distributed no-wait flow-shop scheduling problem with batch delivery2024 · 4 citations
  2. 2Decomposition-based multi-objective approach for a green hybrid flowshop rescheduling problem with consistent sublots2024 · 14 citations
  3. 3An improved whale optimization algorithm for flexible job shop scheduling problems with machine deterioration effects2026 · 2 citations
  4. 4Improved lion swarm optimization algorithm to solve the multi-objective rescheduling of hybrid flowshop with limited buffer2024 · 10 citations
  5. 5A Multi-Objective Grey Wolf Optimizer for Heterogeneous Hybrid Flow Shop Scheduling in Mass Customization2026