PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
May 11, 2026Renewable Energy3 citationsOpen Access

Feasibility Analysis of Geothermal Energy Utilization in Ultra-Low Temperature District Heating Networks: Effect of Heat Distribution in Underground Tunnels

View Full Paper
SOSylvester OfiliHAHossein AlimohammadiIKIgor Krupenski

Key Points

  • This study aims to evaluate the feasibility and performance of geothermal heat pump-based systems in ultra-low temperature district heating networks.
  • System-level modelling in MATLAB/Simulink
  • Investigated geothermal system with 135 boreholes at 200 m depth
  • Analysis of heat distribution and tunnel routing impact on performance
  • Heat pump covers 69% of annual heat demand with a seasonal performance factor of 3.82
  • Borefield remains thermally feasible with no freezing at borehole outlet
  • Tunnel routing reduces annual distribution losses by approximately 183 MWh

Abstract

The integration of ground-source heat pumps into ultra-low-temperature district heating networks represents a promising pathway for decarbonizing urban heat supply and mitigating the shortcomings of conventional high-temperature district heating systems. However, the feasibility of such systems depends on several technical factors related to operating conditions, demand characteristics and heat distribution. This study evaluates the technical feasibility and annual performance of a geothermal heat pump–based ultra-low temperature district heating system operating at supply and return temperatures of 35/20 °C under realistic boundary conditions. The investigated system consists of a ground-source heat pump connected to a borehole field comprising 135 boreholes, each 200 m deep, serving a district heating network with a peak demand of 5.2 MW. A system-level modelling framework implemented in MATLAB/Simulink is used, with district-heating boundary conditions derived from Leanheat® network simulations, to assess a partial peak-load coverage strategy, geothermal borefield behaviour, and the influence of network temperature level and distribution environment, including tunnel based pipe routing, on system performance. The results show that a heat pump sized to cover a fraction of the peak demand can supply approximately 69% of the annual heat demand while achieving a seasonal performance factor of 3.82. Borefield operation remains thermally feasible throughout the annual cycle, with no freezing observed at the borehole outlet. A comparative analysis shows that increasing the network temperature level to 60/40 °C results in similar demand coverage but significantly higher electricity consumption due to reduced heat pump efficiency. Furthermore, routing district heating pipes through an underground tunnel environment reduces annual distribution heat losses by approximately 183 MWh without significantly affecting heat pump performance or hydraulic behaviour. A sensitivity check shows that the tunnel environment partially offsets the increase in distribution heat losses associated with reduced pipe insulation. • Feasibility of GSHP integration in ULTDH assessed using realistic operating data • Partial peak-load GSHP supplies 69% of annual heat with SPF of 3.82 • Borefield operates stably with no freezing under ULTDH conditions • Tunnel-based pipe routing reduces distribution losses by ∼183 MWh annually • Network temperature level strongly influences GSHP efficiency and electricity use

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Ofili et al. (2026) studied this question.

synapsesocial.com/papers/6a0171983a9f334c28271adfhttps://doi.org/10.1016/j.renene.2026.125920
Ask AI
Helpful
Bookmark
Share
View Full Paper