PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
June 1, 2000Construction Management and Economics377 citations

A proposal for construction project risk assessment using fuzzy logic

View Full Paper
JTJ.H.M. TahVCValerie Carr

Key Points

Key points are not available for this paper at this time.

Abstract

The construction industry is plagued by risk and often has suffered poor performance as a result. There are a number of risk management techniques available to help alleviate this, but usually these are based on operational research techniques developed in the 1960s, and for the most part have failed to meet the needs of project managers. In this paper, a hierarchical risk breakdown structure representation is used to develop a formal model for qualitative risk assessment. A common language for describing risks is presented which includes terms for quantifying likelihoods and impacts so as to achieve consistent quantification. The relationships between risk factors, risks and their consequences are represented on cause and effect diagrams. These diagrams and the concepts of fuzzy association and fuzzy composition are applied to identify relationships between risk sources and the consequences for project performance measures. A methodology for evaluating the risk exposure, considering the consequences in terms of time, cost, quality, and safety performance measures of a project based on fuzzy estimates of the risk components is presented.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Tah et al. (2000) studied this question.

synapsesocial.com/papers/6a12d68e17455f99e89e4b70https://doi.org/10.1080/01446190050024905
Ask AI
Helpful
Bookmark
Share
View Full Paper