PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
July 6, 202012 citationsOpen Access

Bim Application in the Operation and Maintenance Management of a Sports Infrastructure

GGGiankeving GuzmanWUWilfredo Ulloa

Key Points

Key points are not available for this paper at this time.

Abstract

Operation and Maintenance (O&M) stage is the most expensive phase during the life cycle of a building. Currently, much of the information used in there is still paper-based and is delivered to the owner months after the facilities are in use. Therefore, it is necessary to study the interaction between Lean principles and Building Information Modeling(BIM) Functionalities in the building during O&M phase to optimize resources. This paper proposes a BIM-FM workflow and compares it with traditional Facility Management in a Peruvian sports infrastructure. The case study was Aquatic Center for the XVIII Pan-American Games and VI Parapan-American Games Lima 2019. The sport infrastructure was designed and built under an Integrated Project Delivery (IPD) environment applying BIM methodology until the construction phase. The main difference found is that proposed BIM-FM workflow improves the efficiencies of the workforce for accessing to accuracy and complete information about Facility's components. Finally, the paper presents barriers in the BIM-FM implementation evidenced in the case study.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Guzman et al. (2020) studied this question.

synapsesocial.com/papers/6a15724fd64fa333899fad71https://doi.org/10.24928/2020/0015
Ask AI
Helpful
Bookmark
Share
View Full Paper