PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
May 29, 2026机械与电子控制工程0 citationsOpen Access

某风电场老旧保护装置改造项目中的安全可控与效率提升策略

张张钦裕杨杨文彪

Key Points

  • The aim is to enhance the safety and operational efficiency of aging protection devices in a wind farm.
  • Involvement of replacing multiple outdated protection devices.
  • Utilization of domestic autonomous devices to increase safety.
  • Implementation of high-capacity digital protection devices including CSC-150A-GCN and CSC-326T1-GCN.
  • Upgrade led to improved safety and controllability of the protection systems.
  • Significant boost in construction efficiency was achieved.
  • Overall, the renovation provided strong support for the efficient operation of the wind farm.

Abstract

本文聚焦某风电场老旧保护装置改造项目,某风电场老旧保护装置改造项目涉及多类老旧保护装置更 换,采用全国产自主可控设备,提升安全可控性。项目计划工期紧张,对施工组织和效率提出挑战。改造实践包括 CSC-150a-Gcn数字式母线保护装置、csc-326t1-Gcn数字式变压器保护装置、csc-336c-Cn数字式非电量保护装置 的应用。这些装置具备高性能、大容量设计,支持多种通信协议,提供全面的保护功能和友好的人机界面,确保风电 场设备的安全稳定运行。改造项目不仅提升了设备的安全性和可控性,还显著提高了施工效率,为风电场的高效运营 提供了有力保障。

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

张钦裕 et al. (2026) studied this question.

synapsesocial.com/papers/6a192f88fab5b468c4418bb3https://doi.org/10.37155/2717-5197-0804-5
Ask AI
Helpful
Bookmark
Share
View Full Paper