Assessment and Ranking of Criteria for Engineering Firm Performance Using RII, Entropy Weight Method, and TOPSIS

View Full Paper
AAAbdulkareem H. AlanaziKAKhalid S. Al-GahtaniAAAbdullah M. Alsugair

Key Points

  • This research aims to systematically evaluate and rank the performance criteria of engineering firms in the Saudi Arabian construction sector.
  • Conducted a PRISMA-compliant literature review to identify performance evaluation gaps.
  • Administered a structured questionnaire to 288 construction professionals in Saudi Arabia (Cronbach’s α = 0.936).
  • Analyzed data using a hybrid RII-Shannon Entropy Weighting-TOPSIS method to establish a Composite Priority Index for performance criteria.
  • Five criteria emerged with Very High Priority status: Supervisory Experience (CPI = 0.740), Engineers’ Capability Index (CPI = 0.717), License Class (CPI = 0.709), Client Satisfaction Index (CPI = 0.708), and Average Delay Time (CPI = 0.705).
  • The highest mean CPI was found in the Quality Indicators dimension, emphasizing the technical capabilities over size.
  • The findings suggest that procurement decisions should focus on demonstrated competency rather than geographical presence.

Abstract

Engineering consultants and design firms are central to the success of construction projects. However, the systematic evaluation of their performance in the Saudi Arabian context remains methodologically fragmented and empirically underdeveloped. Existing prequalification frameworks rely predominantly on administrative criteria and single-method ranking approaches that cannot adequately differentiate between high- and low-performing firms. To address this gap, the study proceeds in two distinct parts. Part I—Literature Review: A PRISMA-compliant systematic literature review across five major academic databases was conducted to map the existing evidence base, identify three substantive gaps in the Saudi and GCC engineering firm evaluation literature, and derive a consensus-based set of 29 performance criteria grouped into seven dimensions. This review constitutes an independent contribution: it establishes the gap that motivates the empirical work and provides the criterion framework on which that work is built. Part II—Practical Application: A structured questionnaire was administered to 288 construction professionals in Saudi Arabia (Cronbach’s α = 0.936), and the collected data were analyzed through a hybrid RII–Shannon Entropy Weighting (EWM)–TOPSIS pipeline that produced a Composite Priority Index (CPI) for each criterion, enabling a stable and discriminating ranking that integrates subjective expert consensus with objective distributional information. The main finding revealed that five criteria attained Very High Priority status (CPI > 0.70): Supervisory Experience (CPI = 0.740), Engineers’ Capability Index (CPI = 0.717), License Class (CPI = 0.709), Client Satisfaction Index (CPI = 0.708), and Average Delay Time (CPI = 0.705). These top-ranked criteria collectively center on technical leadership, regulatory standing, client-reported outcomes, and schedule reliability, indicating that procurement decisions should prioritize demonstrable competence over structural size or geographic footprint. The consistently lower importance of physical branch networks and headquarters location further suggests that remote management capabilities and digital coordination tools are reshaping performance expectations under Saudi Vision 2030. The Quality Indicators dimension achieved the highest mean CPI across all seven dimensions. The findings provide actionable evidence for procurement authorities, regulatory bodies, and engineering firms seeking to strengthen performance-evaluation practices in the Saudi construction sector.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Alanazi et al. (2026) studied this question.

synapsesocial.com/papers/6a2115f6d499ed480b16ef82https://doi.org/10.3390/app16115556
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Quality performance index for assessment of design phase in architectural & engineering companies2026
  2. 2Integrated Risk Priority Assessment of Engineering and Non-Engineering Factors Influencing Saudi Arabian Construction Projects2026 · 1 citations
  3. 3Contributing Factors to Key Performance Indicators of Saudi Arabian Construction Project Success2024 · 2 citations
  4. 4Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects2024 · 4 citations
  5. 5Risk factors influencing construction supply chain management in Saudi Arabia2026