PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
January 1, 20062006 IEEE Power Engineering Society General Meeting246 citations

Advanced grid requirements for the integration of wind turbines into the German transmission system

View Full Paper
IEI. ErlichWWWilhelm WinterADAndreas Dittrich

Key Points

Key points are not available for this paper at this time.

Abstract

In Germany 18 GW wind power will have been installed by the end of 2005. Until 2020, this figure reaches the 50 GW mark. Based on the results of recent studies and on the experience with existing wind projects modification of the existing grid code for connection and operation of wind farms in the high voltage grid is necessary. The paper discusses main issues of the suggested requirements by highlighting major changes and extensions. The topics considered are fault ride-through, grid voltage maintenance respective voltage control, system monitoring and protection as well as retrofitting of old units. The new requirements are defined taking into account some new developments in wind turbine technologies which should be utilized in the future to meet grid requirement. Monitoring and system protection is defined under the aspect of sustainability of the measures introduced

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Erlich et al. (2006) studied this question.

synapsesocial.com/papers/6a2187454a40ae00cbaba323https://doi.org/10.1109/pes.2006.1709340
Ask AI
Helpful
Bookmark
Share
View Full Paper