PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
December 29, 2014IEEE Power and Energy Magazine118 citations

Pushing the Limits: Europe's New Grid: Innovative Tools to Combat Transmission Bottlenecks and Reduced Inertia

View Full Paper
WWWilhelm WinterKEKatherine ElkingtonGBGabriel Bareux

Key Points

Key points are not available for this paper at this time.

Abstract

In the future a growing amount of power electronics will lead to a transition of the power system to a structure with very low synchronous generation. Due to large transit power flows and uncertainties, transmission systems are being operated under increasingly stressed conditions and are close to their stability limits. Together with the integration of large amounts of renewable generation with power electronic interfaces and the addition of high-voltage direct current (HVdc) links into the power system, these challenges will necessitate a review of the operation and control of transmission networks. This article will demonstrate the need for R&D performed by network operators and explain a set of challenges, focusing on three main areas: transmission grid operation in a new power system environment, the need to increase overhead line (OHL) utilization, and the impact of reduced inertia on power system frequency.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Winter et al. (2014) studied this question.

synapsesocial.com/papers/6a248ef0d753e03433863853https://doi.org/10.1109/mpe.2014.2363534
Ask AI
Helpful
Bookmark
Share
View Full Paper