March 28, 2025IEEE Transactions on Power Delivery19 citations

A New Approach to Determine Feasible Operating Region of Unbalanced Distribution Networks With Distributed Photovoltaics

View Full Paper
MPManorath PrasadZRZakir Hussain RatherRRReza Razzaghi

Key Points

Key points are not available for this paper at this time.

Abstract

Amidst rising distributed generation and its potential role in grid management, this article presents a new realistic approach to determine the operational space and flexibility potential of an unbalanced active distribution network. The feasible operating region of an active distribution network is constituted by its range of active-reactive power exchanges with the bulk power system without breaching network constraints. This study explores the potential of highly penetrated single- and three-phase distributed photovoltaics and voltage-sensitive loads to determine the feasible operating region at different operating points. The cumulative response of Volt-Var controlled distributed photovoltaics and voltage-sensitive loads determines the power flow at the bulk power system-active distribution network interconnection, ensuring feasibility with respect to voltage magnitude and unbalance constraints. Further, the correspondence of feasible operating region with the tap-settings of substation transformer enables a novel feature to traverse throughout the available operating region and facilitate bulk power system-active distribution network power coordination. Additionally, a nodal sensitivity-based adjustable Volt-Var control scheme is proposed for distributed photovoltaics, improving the feasible operating region. The proposed strategy is validated on bulk power system-active distribution network integrated test system. Bulk power system: IEEE-9 bus system – Active distribution network: (highly unbalanced IEEE-13 bus distribution system (medium voltage) + modified CIGRE low voltage system).

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Prasad et al. (2025) studied this question.

synapsesocial.com/papers/6a24cb5152c3b9916df6b30dhttps://doi.org/10.1109/tpwrd.2025.3555210