PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
March 1, 2001IEEE Industry Applications Magazine231 citations

Planning for Distributed Generation

View Full Paper
RDR.C. DuganTMThomas E. McDermottGBGreg Ball

Key Points

Key points are not available for this paper at this time.

Abstract

Distributed generation (DG) can be incorporated into distribution planning as an option along with traditional feeder and substation options. In place of rigid capacity planning rules, the planning process needs to incorporate more detailed simulations of capacity constraints and customer damage costs because utilities now assume more risk. Planning tools need to simulate load variations, contingencies, dispatch and control action to more accurately determine the capacity limits and related costs. This is especially important when considering DG because the siting and dispatch have an important impact on the benefits to the utility. Equally important is the evaluation of economic risk given uncertainties such as load growth. Because of the added complexities associated with these analysis techniques, the planning process must incorporate appropriate screening tools to determine the depth of analysis needed for particular projects, thereby making more efficient use of already scarce planning resources.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Dugan et al. (2001) studied this question.

synapsesocial.com/papers/6a6ef028c2d7c3090826baf6https://doi.org/10.1109/2943.911193
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Why risk analysis outperforms probabilistic choice as the effective decision support paradigm for power system planning1998 · 117 citations
  2. 2A model for integrated analysis of generation capacity expansion and financial planning1999 · 45 citations
  3. 3Cost-benefit analysis of power system reliability: two utility case studies1995 · 96 citations
  4. 4Integrating transmission into IRP part II: case study results1995 · 12 citations
  5. 5Distribution planning with fuzzy loads and independent generation1997 · 10 citations