Generic Scheduling Optimization Model for Multiple Construction Projects

View Full Paper
MEMohammed S. El-AbbasyAEAshraf ElazouniTZTarek Zayed

Key Points

Key points are not available for this paper at this time.

Abstract

In the construction industry, contractors usually manage and execute multiple projects simultaneously. Typically, this situation involves sharing different types of resources, including cash, equipment, and manpower. The management of resources becomes a major challenge in these problems. In this situation, contractors are concerned with optimizing a number of different objectives which often conflict with one another. These objectives include duration, total cost, financing cost, required cash, profit, and resource fluctuations. This paper presents the development of a multiobjective scheduling optimization model for multiple construction projects using the fast elitist nondominated sorting genetic algorithm (NSGA-II). The purpose of the proposed model is to obtain optimal trade-offs between different projects’ objectives. The scheduling optimization model comprises submodels of project scheduling, resource allocation and leveling, and cash flow forecasting. The optimization model was successfully implemented and tested using different case studies of multiple projects of different sizes. The developed model is expected to help construction companies in solving the problems of prioritizing projects under resource-conflict conditions, allocating limited resources, and optimizing all the projects’ multiple objectives under certain funding limits.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

El-Abbasy et al. (2017) studied this question.

synapsesocial.com/papers/6a726896a7fbea1e4408a9d9https://doi.org/10.1061/(asce)cp.1943-5487.0000659
Ask AI
Helpful
Bookmark
Share
View Full Paper