January 1, 2009IEEE Transactions on Power Delivery335 citations

Placement of Synchronized Measurements for Power System Observability

View Full Paper
SCSaikat ChakrabartiEKElias KyriakidesΔΗΔημήτριος Γ. Ηλιάδης

Key Points

Key points are not available for this paper at this time.

Abstract

This paper presents a method for the use of synchronized measurements for complete observability of a power system. The placement of phasor measurement units (PMUs), utilizing time-synchronized measurements of voltage and current phasors, is studied in this paper. An integer quadratic programming approach is used to minimize the total number of PMUs required, and to maximize the measurement redundancy at the power system buses. Existing conventional measurements can also be accommodated in the proposed PMU placement method. Complete observability of the system is ensured under normal operating conditions as well as under the outage of a single transmission line or a single PMU. Simulation results on the IEEE 14-bus, 30-bus, 57-bus, and 118-bus test systems as well as on a 298-bus test system are presented in this paper.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Chakrabarti et al. (2009) studied this question.

synapsesocial.com/papers/6a733287d7374855d0c8f41chttps://doi.org/10.1109/tpwrd.2008.2008430
Ask AI
Helpful
Bookmark
Share
View Full Paper