Use of Genetic Algorithms in Resource Scheduling of Construction Projects

View Full Paper
ASAhmed SenouciNENeil N. Eldin

Key Points

Key points are not available for this paper at this time.

Abstract

This paper presents an augmented Lagrangian genetic algorithm model for resource scheduling. The algorithm considers scheduling characteristics that were ignored in prior research. Previous resource scheduling formulations have primarily focused on project duration minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. The model presented here considers all precedence relationships, multiple crew strategies, total project cost minimization, and time-cost trade-off. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The model presented uses the quadratic penalty function to transform the resource-scheduling problem to an unconstrained one. The algorithm is general and can be applied to a broad class of optimization problems. An illustrative example is presented to demonstrate the performance of the proposed method.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Senouci et al. (2004) studied this question.

synapsesocial.com/papers/6a781fe1d8eb58afc2be5d0bhttps://doi.org/10.1061/(asce)0733-9364(2004)130:6(869)
Ask AI
Helpful
Bookmark
Share
View Full Paper