An advanced exploration of functionalities as the underlying principles of construction control metrics

MSMoslem SheikhkhoshkarHEHind Bril El-HaouziAAAlexis Aubry

Key Points

Key points are not available for this paper at this time.

Abstract

Purpose In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry. Design/methodology/approach A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities. Findings The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow. Originality/value This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Sheikhkhoshkar et al. (2024) studied this question.

synapsesocial.com/papers/6a79f37e8d250a4360f3d17bhttps://doi.org/10.1108/sasbe-12-2023-0379
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Automated Schedule and Progress Updating of IFC-Based 4D BIMs2017 · 103 citations
  2. 2Industry 4.0 Solutions for Building Design and Construction2021 · 36 citations
  3. 3Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning2014 · 26 citations
  4. 4A comparison of the performance of various project control methods using earned value management systems2014 · 63 citations
  5. 5An innovative method for project control in LNG project through 5D CAD: A case study2014 · 37 citations