Genetic algorithm for the resource-constrained project scheduling problem

View Full Paper
ЕГЕ. Н. ГончаровVLV.V. Leonov

Key Points

Key points are not available for this paper at this time.

Abstract

We consider the resource-constrained project scheduling problem with respect to the makespan minimization criterion. The problem accounts for technological constraints of activities precedence together with resource constraints. We propose a genetic algorithm with two versions of crossovers based on the idea of most rational use of constrained resources. The crossovers uses a heuristic that takes into account the degree of criticality for the resources, which is derived from the solution of a relaxed problem with a constraint on accumulative resources. A numerical experiment with examples from the PCPLIB library has shown that the proposed algorithm has competitive quality. For some examples from the j120 test series the best known solutions were improved and for j60 (50 000 and 500 000 iterations) and for j120 (500 000 iterations) we have obtain the best average deviations of the solutions from the critical path value.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Гончаров et al. (2017) studied this question.

synapsesocial.com/papers/6a7d734b8253d2b493a005f3https://doi.org/10.1134/s0005117917060108
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1A Neurogenetic approach for the resource-constrained project scheduling problem2010 · 121 citations
  2. 2Justification and RCPSP: A technique that pays2004 · 264 citations
  3. 3A hybrid genetic algorithm for the resource-constrained project scheduling problem2007 · 252 citations
  4. 4A random key based genetic algorithm for the resource constrained project scheduling problem2007 · 245 citations
  5. 5A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem2005 · 26 citations