Key points are not available for this paper at this time.
The purpose of this article is to restore the changed image of the Aragaya Tombs by analyzing the construction method of the Haman Malisan Ancient Tombs and Nammunoi Ancient Tombs, the royal tombs of Aragaya. The construction method of the silt was divided into three types by analyzing three methods: the anti-rock extraction method, the levee construction method, and the compartment construction method. Type A is a type in which the anti-rock extraction method is usually used, and the levee construction method and the compartment construction method are not used. Type A is divided into Type A-1 and Type A-2 depending on the location of the tomb. Type B was subdivided into Type B-1 and Type B-2 according to the degree of application of the levee construction method. The levee construction method is used on the outer edge of the levee, and the soil is built using the compartment construction method inside the levee. In Type C, the use of soil construction method is reduced on the outer edge of the levee, but the compartmentalization construction method is still used. Aragaya appears to be divided in the order of the head group according to the type of tombs.
Cheongwoo Yun (Thu,) studied this question.