Key points are not available for this paper at this time.
B. Aim and Objective of the ProjectAim of the project is provide high level of service continuously to the customer by reducing the time during the fault.The main objective is to make the system reliable, fast, less time consuming and rigid.Which can cause very less interruption in the power supply during the temporary fault.For permanent fault it relocates the distance therefore we can resolve the problem physically, mainly on transmission line. C. Description of the Project 1) AIM:To reduce time during the correction of fault in three phase transmission line.2) Design: This project consists of Transformer, Rectifier and Filters, Buck convertor, Arduino, Relay, LCD Display, ULN2003, etc...The input power for this project is not exceed more than 225V, which is the input of transformer that gives 12v output.It works on the very low power, so that the losses are also very less and rating of the circuit breaker, conductor, Insulation is very less.This project is very sensitive.3) Costs: It has high installation cost, maintenance cost and less running cost.It also needs very less worker for controlling and monitoring because it is fully automated.
Animesh Kumar (Mon,) studied this question.