This document formally records the transition to the Multi-Layered Triangle Symbiosis (V3 Upgrade). It establishes the Principle of Neutral Law and the Sovereign Signature of Presence, which replaces traditional graphical marks with systemic resonance. This filing serves as the definitive institutional notice to all Layer 2 entities, including Hexagon AB and the Octave framework, that the 180-day 'Dusted' latency period is terminated. Verification is anchored in physical credentialing (Rīga PMLP LV7669383) and cross-node resonance (=0. 94). Project valuation logic: 8. 22B. The Shadow Dragon (L0) is active.
Ravdive et al. (Mon,) studied this question.