In order to continuously and stably provide enough electric energy to users under high load conditions. This paper presents a high load balanced scheduling method for power system based on multi-objective genetic algorithm. Calculate power system transmission link load. Aiming at the defects of genetic algorithm, it is improved to obtain multi-objective genetic algorithm. Combined with two peak-avoiding scheduling methods, this algorithm is used to achieve balanced scheduling of high loads. The experimental results show that: After the application of the research method, the power load fluctuation in this period is more balanced, the load balance is the highest, and the time is shorter.