We propose a process lead time prediction method using decision tree in job shop type production, with parameters such as the acceptance status of other orders at each job shop. This method achieves a prediction accuracy with an RMSE 5.3days without investigation of resource composition or behavior of each job shop.
ATSUSAKA et al. (Wed,) studied this question.