Key points are not available for this paper at this time.
The results of this study show key challenges to ACSM implementation of MDA for LF. Implementers need to pay attention to these challenges to enhance the effectiveness of MDA per the Kenya NTD Breaking Transmission Strategy. ACSM efforts in MDA for LF control and elimination should be linked with overarching efforts to mainstream partnerships and coordination in control and elimination.
Kibe et al. (Mon,) studied this question.