D4.1 and D4.2 describe the deployment of infrastructure and pillar services of RITMOCORE's model during the first six months and first year of the project, respectively. They look at how the infrastructure and pillar services were defined in the tender documents and in the bidders' proposals, and contrast the definitions with material gathered from interviews with stakeholders in the implementation of the model. D4.3 and D4.5 introduce the results obtained in the 2021 activity and quality indicators: D4.3 presents the numbers and looks at what each indicator means, and D4.5 interprets the indicators in conjunction with the findings presented along the entire WP4. D4.4 demonstrates the deployment of RITMOCORE's model through multimedia content.
Moreno-Pérez et al. (Sun,) studied this question.