In this paper, we address a Stochastic-Demand Assembly Job Shop Scheduling Problem (SD-AJSSP) in the presence of the commonality of sub-assemblies across products. We propose a new production methodology, named Assemble-to-Order with Commonality of Sub-Assemblies (ATO-CS) to not only solve the SD-AJSSP, but also, achieve a successful implementation of a mass customisation system by collectively aiming to (1) keep the production costs low by leveraging upon commonality of sub-assemblies in products’ BOM and producing sub-assemblies on a mass scale during one of the two stages of production, (2) minimise the loss due to excess inventory build-up in anticipation of stochastic demand of products by postponing the production of certain apex sub-assemblies in products’ BOM until the actual demand is realised, and (3) reduce the time of the products’ delivery to customers. The ATO-CS method determines optimum production levels as well as schedules assembly operations/jobs over the machines at each stage of production, where the second stage is an assembly job shop and is shown to outperform commonly-used production methodologies. We also develop an algorithm for its implementation and show its efficacy over the use of the state-of-the-art commercial solver CPLEX® in obtaining a lower solution cost and smaller optimality gap.
No takes yet. Share an insight, caveat, or question.
Singh et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: