Key points are not available for this paper at this time.
This paper addresses the self-scheduling problem of a price-taker power producer. It focuses on risk modeling, emphasizing the tradeoff existing between maximum profit and minimum risk. The paper analyzes a self-scheduling model that considers simultaneously profit and risk. This model is formulated as a mixed-integer quadratic programming problem, which is solved using commercially available software. Relevant results from a realistic case study are discussed.
Conejo et al. (Sun,) studied this question.