Key points are not available for this paper at this time.
Recently, formal approaches to interface management (IM) have been adopted in a number of large-scale engineering and construction (E however, they are not as effective for dealing with project complexity originating from large numbers of engineered items. These results provide insights into the direction of future advancement in IM techniques for large-scale E&C projects.
Ahn et al. (Fri,) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: