This evaluation model demonstrates performance assessment in mechanized construction, highlighting constraints and suggesting improvements.
To enhance the effectiveness of mechanized overhead transmission line construction, this study introduced an evaluation model utilizing FUCOM-F-CM to assess its performance. The method adopts the FUCOM method based on triangular fuzzy numbers to determine the weight of evaluation indexes, and combines the cloud model to establish a performance evaluation model, using the obstacle degree model to judge the short board factors, to judge the constraints affecting the level of performance of mechanized construction of overhead transmission lines to improve the level of performance, and to provide a theoretical basis for the development of targeted performance measures. Finally, the method was applied to an overhead transmission line project. Through empirical research, the performance evaluation results were analyzed, and corresponding improvement measures were proposed to provide a theoretical basis for formulating targeted performance improvement measures.
No takes yet. Share an insight, caveat, or question.
Hou et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: