The tr chart is a Shewhart-type control chart used to monitor the time between events, especially in high-quality processes. It has been shown to be more efficient than classical attribute control charts based on count data. In practical applications, the in-control process parameters are often unknown and need to be estimated from a Phase I reference sample. When the available Phase I data are small and the chart parameters have to be estimated, a popular approach is to adjust the control chart limits from a conditional perspective to avoid frequent false alarms using the exceedance probability criterion. However, this approach ignores the practitioner-to-practitioner (p-to-p) variation caused by the random Phase I reference samples, which results in getting different control limits and chart performance for each practitioner Large p-to-p variation makes practitioners to have a limited confidence on using their own estimated charts. Hence, in this article, we propose to optimize the tr chart via an exact method so that it has a minimum p-to-p variation. Comparisons between the optimal and conventionally adjusted charts are made in both the in- and out-of-control cases. The most important results are that the optimal chart has a far smaller p-to-p variation and its unconditional average run length values are closer to the desired ones compared to the conventional approach regardless of the in- or out-of-control cases. Finally, two real examples are presented to illustrate the implementation of the proposed chart.
No takes yet. Share an insight, caveat, or question.
Guo et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: