Rural electrification is a crucial step for the socio-economic development of isolated communities. Decentralized power generation, typically more favorable for renewable energies, requires an accurate analysis of the different electrification options, whose convenience depends on multiple factors. The application of Geographical Information System (GIS) to energy planning allows the assessment at a local level, considering spatial resources variability and demand distribution. This work introduces IntiGIS-local, a GIS-based model implemented in ArcGIS environment, designed to calculate the Levelized Energy Cost (LEC) for different electrification options. The model allows the comparison between three power generation alternatives: solar system, diesel generator set and solar-diesel hybrid system. Configurations are adjustable through input variables, with a special focus on the confrontation between individual systems and microgrids. The objective is to provide an adequate groundwork for developing a decision-making tool to assess diverse rural electrification options in future studies. The model IntiGIS-local is tested in the case study of Guasasa community (Cuba).
No takes yet. Share an insight, caveat, or question.
Domínguez et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: