Answers are grounded in this paper and cite their sources.
Uncontrolled punch through during set down of an XXL monopile can be disastrous for a (floating) installation vessel. An analytical model was developed to predict punch through capacity for monopiles on sand-over-clay conditions. Material Point Method (MPM) analyses were used for validation of the model and a proposed risk mitigating measure that allows for a controlled punch through, with reduced risk to vessel and equipment. Field observations from construction of a wind farm off the US East coast allowed for full scale validation of the model and reflect the effectiveness of the risk mitigating measures taken.
No takes yet. Share an insight, caveat, or question.
Thijssen et al. (2024) studied this question.