Answers are grounded in this paper and cite their sources.
As the application background of fieldbus becomes more and more extensive, PROF I BUS contains multiple master stations, and a multi-master system with multiple slave stations emerges at the historic moment. This paper establishes a multi-master communication system model and uses simulation technology to study the relationship between the target token cycle time, token waiting time, and master site address value.
No takes yet. Share an insight, caveat, or question.
Sun et al. (2024) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: