The use of Public-Private Partnership (PPP) and Land Value Capture (LVC) as a procurement model to deliver Urban Rail Transit (URT) systems and networks has received mixed reviews. This paper addresses the following research question: How can the public sector effectively realise the benefits of integrating PPP with LVC when procuring URTs? We use a structured-case method to build, test, and revise a series of conceptual frameworks from the experiences of cities (i.e., Guangzhou, Guiyang, and Wuhan). The contributions of this research are threefold as it: (1) provides a state-of-the-art examination of PPP and LVC practice; (2) develops a convergent framework that takes into consideration the context and sub-contexts of PPP and LVC used to procure URTs; and (3) presents the public sector with a frame of reference that can be drawn upon to realise the benefits of integrating PPPs with LVC.
No takes yet. Share an insight, caveat, or question.
Li et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: