The fight against avalanches and the elimination of their consequences is urgent. The purpose of the article is to develop measures for preventing avalanches, especially sudden but not only planned ones. The subject of the study is snow avalanches, their volumes, and their causes. The result of the study is the development of standard technological flowcharts for snow removal work on the backbone network of the NC KTZh JSC. Freight trains travel 1000 km per day. It is necessary to increase this speed to 1200 km/day. The nominal FTI amounted to 75 trillion tenge in 2020; in 2024 it will be 106 trillion tenge. This will require transportation of construction materials and minerals, gasoline and diesel fuel, grain and flour, fertilizers, seeds, herbicides and pesticides, crop and livestock products.
No takes yet. Share an insight, caveat, or question.
Ibraimov et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: