PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
February 27, 2024Maritime Park Journal of Maritime Technology and Society0 citationsOpen Access

Comparative Numerical Analysis Fatigue Damage Based On Variation In Quantities Mooring Line On Aker Smart 2 FPSO

View Full Paper
NANur Salsabila Aulia

Key Points

Key points are not available for this paper at this time.

Abstract

The Aker Smart 2 FPSO is the second FPSO from the Norwegian FPSO operator: Aker Floating Production, and will operate for Reliance in India. This FPSO will be moored with a mooring system catenary to the seabed. In its operation, the FPSO will be influenced by dynamic loads such as sea waves, ocean currents and wind on the mooring rope structure periodically. This may cause damage to the structure mooring line which influences the performance of the operational structure. The aim of this research is to investigate motion trajectory (surge & sway), mooring line stress, and deterministic fatigue on the mooring system catenary by making comparisons using variations in quantities mooring line. Dimensions mooring line type chain on fairlead with varying amounts mooring line namely 4x1, 4x2, and 4x3 which will then be analyzed fatigue damage-his. Numerical observations of FPSO motion on following seas, stern quartering seas, beam seas, bow quartering seas, and head seas show Response Amplitude Operator from movement surge, sway, heave, roll, pitch, and yaw due to harsh environments with Hs = 2.0 meters and T = 12 seconds. Observation Motion Trajectory it is found that the greater the number mooring line then value DOffset or movement surge & sway will get smaller. Meanwhile, in observation Mooring Line Stress and Fatigue Damage obtained both are directly proportional where the greater the tension mooring line the greater the damage. This is because the mass of the rope used is not proportional to displacement boat. And in this numerical analysis simulation it only reaches the initial movement, namely at 100 seconds, where the ship's condition has not yet reached the stable condition it should be.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Nur Salsabila Aulia (2024) studied this question.

synapsesocial.com/papers/68e77698b6db6435876eb7b4https://doi.org/10.62012/mp.v3i1.32980
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Numerical Studies Fatigue Damage From Material Variations Catenary Mooring System FPSO Al Zaafarana2024
  2. 2Analysis of The Effect of mooring Depth & Fatigue Damage on Mooring Line FPSO Ship Azurite In The Masela Block2024
  3. 3Configuration Comparison Catenary Spread Mooring Line On The Movement Characteristics Of Fpso Ships Using Numerical Analysis2024
  4. 4Mooring Design and Fatigue Damage on Variant Fairlead Positions During FPSO Operation – Case Study2024
  5. 5The Safety Analysis of a FPSO Temporary Mooring System at Quayside With One Line Failure2024