This research demonstrates improved recovery efficiency through optimized shut-in and drainage strategies in unconventional reservoirs, highlighting significant findings for production methods.
Aiming at unclear imbibition replacement mechanisms and flowback/production strategies in unconventional reservoirs of the Erlian Block, this study proposes a systematic approach integrating “imbibition-flowback-productivity synergy” to optimize post-fracturing shut-in and production regimes. By developing numerical models incorporating geological and engineering factors, we analyzed fluid dynamics during both the shut-in and production phases. Concurrently, crude oil displacement-fracturing fluid imbibition replacement experiments were conducted to guide parameter optimization. The results indicate that optimized shut-in time and production rates substantially increase recovery efficiency while mitigating reservoir damage and proppant flowback. The well shut-in time of the Erlian Block can achieve the optimal shut-in replacement effect in about 20–25 days. The optimized flowback rate of the unconventional reservoir in the Erlian Block is 25–30 m3/d. The findings offer theoretical insights and practical recommendations for the efficient development of unconventional resources.
No takes yet. Share an insight, caveat, or question.
Li et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: