October 27, 2025Asian Journal of Engineering Social and Health0 citations

Strategic Decision Analysis in Disposal Selection to Manage Production Continuity at Pit KGB PT BIB

View Full Paper
YSYanuar Maruli Tuah SaragiYSYos Sunitiyoso

Key Points

  • Optimizing operational efficiency ensures production targets can be met sustainably.
  • Evaluation of strategies included safety and environmental impact assessments.
  • Kepner-Tregoe and Fishbone methods identified root causes of disposal limitations.
  • Alternative solutions were discussed including fleet maintenance and sequence of operations.

Abstract

PT BIB, one of Indonesia’s largest coal companies, aims to increase its production capacity annually, with a coal production target of 46.8 million tons approved by the Ministry of Energy and Mineral Resources (ESDM). Achieving this target has become increasingly challenging due to operational delays and environmental constraints, particularly the limited disposal capacity at the KGB Pit. This research focuses on identifying the best decision-making strategies to optimize mining operations, specifically addressing the disposal capacity issues caused by poor materials, landslides, and spatial limitations for disposal locations. The Kepner-Tregoe and Fishbone (Ishikawa) Diagram methods were employed to identify the root causes of these limitations systematically. Three alternative solutions emerged from expert discussions: maintaining the fleet, relocating the fleet, and improving the sequence of operations. The SMART method was applied to determine the best course of action, evaluating each alternative against criteria such as production volume, haulage distance, stripping ratio, preparation time, safety, and environmental impact. The findings provide a clear path forward for optimizing operational efficiency at PT BIB, ensuring that production targets can be met sustainably and effectively.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Saragi et al. (2025) studied this question.

synapsesocial.com/papers/68ff87f1c8c50a61f2bdd52dhttps://doi.org/10.46799/ajesh.v4i5.617
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Decision-Analysis for the Best Option to Optimize Mine Planning at Pit Kusan for 2025-2029 Period, PT Borneo Indobara2025
  2. 2Strategic Decision Analysis in Mine Planning to Achieve Coal Production Target due to Mud Accumulation: A Case Study at Pit Garuda, PT Bara Nusantara Energi2025
  3. 3Decision Making Analysis in Phase 7 Road to Support A 54 MT Production Plan at PT Kusan Girimulya Wijaya2025
  4. 4Decision Making Acquisition Corridor Area to Get Additional Reserve to Extend the Mining Life at PT Borneo Indobara2025
  5. 5Optimizing Coal Reserves at Pit Muara Tiga Besar Utara (MTBU) PT Bukit Asam to Increase Production in 20252025