Mathematical model determines optimal variants for construction projects under capital investment limits, maximizing income.
The article considers the problem of putting a certain number of construction projects into operation. It is assumed that a corresponding number of variants (crews) can be used to put each project into operation. It is required that for each construction project such variants were selected and used that the total cost required for them not exceed the allocated funds, that only one variant be used for each project, and the income received be maximum. A mathematical model of this problem is built and an approximate solution method of is developed.
No takes yet. Share an insight, caveat, or question.
Mammadov et al. (2024) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: