Answers are grounded in this paper and cite their sources.
This paper presents a strategy implemented for preparation of the national User Requirements Specifications (URS) for European Train Control System (ETCS) with Level 2 in the Republic of Serbia. The requirements were the result of several parallel activities: gaining experience from similar implementations of the ETCS in the framework of the European TEN-T corridor railway lines, consultations about the specific technical solutions with the institutions and several suppliers of signalling equipment. The process resulted with a comprehensive specification, which will be used as a firm basis for further implementation of the ETCS system on Serbian railway network.
No takes yet. Share an insight, caveat, or question.
Ivan Ristić (2023) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: