Automatic Detection of Construction Conflicts and Risk Prediction Based on the Integration of Building Information Modeling and Graph Neural Networks

View Full Paper
YCYunzhou Chen

Key Points

  • The research aims to address ineffective conflict detection and risk assessment in civil infrastructure projects by integrating BIM with graph neural networks.
  • Proposed a framework that combines Building Information Modeling with Graph Neural Networks.
  • Conceptualized BIM data as a high-dimensional graph with nodes representing building elements.
  • Introduced a Structured Multi-Semantic Encoder Network for handling heterogeneous BIM data.
  • Developed a Temporal-Aware Semantic Coordination Engine for dynamic project management.
  • Achieved top-1 performance in conflict detection accuracy across four benchmark datasets.
  • Demonstrated improved risk prediction capabilities compared to traditional methods.
  • Highlighted the effectiveness of the integrated BIM-GNN approach in construction management.

Abstract

The increasing complexity of civil infrastructure projects necessitates advanced methodologies for efficient design, construction, and management. Traditional Building Information Modeling systems, while instrumental in digitizing construction processes, often fall short in addressing dynamic project requirements and complex interdependencies among building components. Conventional approaches primarily rely on rule-based systems and manual interventions, leading to inefficiencies in conflict detection and risk assessment. To overcome these limitations, we propose a framework that integrates BIM with GNNs and demonstrates improved conflict detection and risk prediction accuracy across four benchmark datasets. Our approach conceptualizes BIM data as a high-dimensional graph, where nodes represent building elements and edges denote spatial and functional relationships. We introduce the Structured Multi-Semantic Encoder Network, which captures the intricate interplay between geometry, taxonomy, and compliance features through a variational perspective, effectively handling incomplete or heterogeneous BIM data. We develop the Temporal-Aware Semantic Coordination Engine, an adaptive module that aligns contractor interpretations with standardized ontologies, facilitating dynamic project evolution management. Our framework addresses the critical need for automation and artificial intelligence in construction, aligning with the objectives of enhancing planning, design, and management of civil infrastructure assets. Experimental results demonstrate achieves top-1 performance on all datasets in conflict detection accuracy and risk prediction capabilities, underscoring the potential of our integrated BIM-GNN approach in revolutionizing construction management practices.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Yunzhou Chen (2026) studied this question.

synapsesocial.com/papers/6975b306feba4585c2d6e859https://doi.org/10.1142/s0219467827500914
Ask AI
Helpful
Bookmark
Share
View Full Paper