February 28, 2026Water0 citationsOpen Access

Flood Event Escalation and Urban Drainage Design Implications Under Nonstationary Rainfall in São Paulo State, Brazil

View Full Paper
ABAbderraman R. A. BrandãoMCMaria A. R. A. CastroMSM. S. Sanchez

Key Points

  • To analyze flood events and assess the impact of nonstationary rainfall on urban drainage design and costs in São Paulo State.
  • Characterized historical flood events from 1991 to 2024 in São Paulo State.
  • Quantified impacts of rainfall projections (CMIP6 SSP2-4.5 and SSP5-8.5) on culvert sizing.
  • Analyzed the effects on construction costs across municipalities under various return periods.
  • Average flood occurrence increased from 7.8 events per year in the 1990s to 72.9 in the 2010s.
  • In the immediate future (2015–2055), for return periods ≤ 25 years, 68% of municipalities show cost increases up to 10%.
  • By 2056–2100, 86% of municipalities exceed 10% in projected costs under SSP5-8.5.

Abstract

Reliable urban stormwater design under nonstationary rainfall is becoming increasingly important, yet quantitative links between floods occurrence, updated design requirements, and associated costs remain limited. This study (i) characterizes the evolution and impacts of flood-related events in São Paulo State, Brazil (1991–2024), and (ii) quantifies how nonstationary rainfall projections (CMIP6 SSP2-4.5 and SSP5-8.5) affect culvert sizing and construction costs across municipalities for standardized hypothetical catchments, across multiple return periods and future horizons. Observations indicate an increase in flood occurrence, from an average of 7.8 events per year in the 1990s to 72.9 events per year in the 2010s. In the immediate future (2015–2055), SSP2-4.5 projected costs remain close to the baseline for most municipalities (for return periods ≤ 25 years, 68% show increases up to 10%), whereas for the distant future (2056–2100) 86% exceed 10% under SSP5-8.5. However, under SSP5-8.5 in the immediate future (2015–2055), and for RP > 25 years, approximately 46% of municipalities exceed 10% additional costs. Design discharges generally rise by 9–43% in the immediate future, with stronger increases under SSP5-8.5 toward the late century. Mapping required hydraulic area to commercially available nominal sizes discretizes upgrades and creates threshold behavior, with larger basins crossing size classes more often. These findings challenge the assumption of stationary design and support the adoption of nonstationary adaptation strategies to reduce the long-term probability of structural failure.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Brandão et al. (2026) studied this question.

synapsesocial.com/papers/69a287f20a974eb0d3c03c9dhttps://doi.org/10.3390/w18050561
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Severe droughts reduce river navigability and isolate communities in the Brazilian Amazon2024 · 76 citations
  2. 2ECONOMIC IMPACTS OF NATURAL DISASTERS IN MEGACITIES: THE CASE OF FLOODS IN SÃO PAULO, BRAZIL132 citations
  3. 3Impact of the greenhouse effect on sewerage systems—Lund case study1989 · 45 citations
  4. 4Estimating Peak Runoff Rates Using the Rational Method2019 · 38 citations
  5. 5Köppen's climate classification map for Brazil2013 · 12,146 citations