This evaluation demonstrates improved cost savings in machinery fleets, suggesting a tailored forecasting model enhances maintenance efficiency.
Industrial machinery fleets in Tanzania face challenges related to maintenance costs and operational efficiency, necessitating robust cost-effectiveness analysis (CEA). Current methods often lack precision and are not tailored to local conditions. The research employs a time-series forecasting model (e.g., ARIMA) with robust standard errors accounting for forecast uncertainty. Data from ten randomly selected factories were analysed over three years to ensure representativeness. A significant proportion (72%) of machinery failures could be predicted within one month, reducing maintenance costs by an average of £150 per machine per year ($300). The time-series forecasting model effectively estimates cost savings and operational improvements for Tanzanian industrial machinery fleets. Advising fleet managers to incorporate the recommended model into their decision-making processes could lead to substantial cost reductions without compromising equipment reliability. The maintenance outcome was modelled as Yᵢₜ=β₀+β₁Xᵢₜ+uᵢ+εᵢₜ, with robustness checked using heteroskedasticity-consistent errors.
No takes yet. Share an insight, caveat, or question.
Kamasi Mwale (2006) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: