Progress report details the construction of LISA and SURF, showing design and measurement outcomes.
We report the construction progress of the superconducting (SC) linac LISA and of the FEL experiment SURF at LNF. The design criteria of the 25 MeV transport line from the linac to the undulator are presented and the operating and emittance measurements of the 100 keV gun are described.
No takes yet. Share an insight, caveat, or question.
M et al. (1992) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: