This report describes the design of the radiation shield around the energy degrader target at the beginning of the BTF transfer line, successfully installed in May 2008. In particular, the results of Monte Carlo code (Fluka) simulations have been discussed, while the processing of the dose measurements, before and after the installation, is still in progress and will be discussed in a next work.
R. et al. (Wed,) studied this question.