Answers are grounded in this paper and cite their sources.
This proposal aims to establish an RF power hall to test accelerating structures using a 50 MW klystron, indicating enhanced testing capabilities.
In this paper we present a study to provide the LNF, under the Accelerator Division responsibility, of an RF power hall to accommodate a 50 MW X-Band klystron together with its High Voltage modulator to be used as a test stand for characterizing high frequency RF accelerating structures. The proposal is to locate the Test Hall in a portion of the LNF building #7 where a shielded bunker already exists and has been used to test and pre-conditioning the DAFNE RF cavities before their installation in the accelerator halls
No takes yet. Share an insight, caveat, or question.
D. et al. (2007) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: