Proposes a framework to analyze risk propagation in Public–Private Partnership projects, suggesting implications for risk control.
Interdependent factors in complex engineering systems propagate and amplify through directed influence networks rather than evolving independently. This study proposes a causality-informed dynamic transmission framework and applies it to risk propagation in Public–Private Partnership (PPP) infrastructure projects. Directed inter-factor influences are quantified using the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method to construct a directed influence structure. Each factor’s endogenous evolution is modeled by a logistic trajectory (slow accumulation–rapid escalation–gradual saturation), while an external-transfer component separates internal dynamics from transmission-induced increments. A five-dimension, 21-factor PPP risk system is developed from the literature and failure cases. Here, “causality-informed” denotes expert-elicited directional assumptions, not formal counterfactual causal identification. The results show that transfer-driven increments concentrate mainly in technical/engineering and economic dimensions, whereas political/legal risks exhibit smaller increments; such increments are most evident for preparation-related and all-stage factors and cluster around the rapid-rise interval. We further propose the Risk Transmission Initiation Index (RTII) to identify likely upstream initiators with cascade-triggering potential, enabling prevention-oriented risk control in coupled engineering systems.
No takes yet. Share an insight, caveat, or question.
Li et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: