Bridge Information Modeling (BrIM) is considered an innovation in bridge engineering and construction industry. This paper presents a methodology for using BrIM as an assisting tool in performing detailed cost estimates. The methodology depends on integrating visualization feature of BrIM with specific attributes of the BrIM model intelligent components. A program developed using C# language is used to extract the visualization conclusions and other components’ attributes to MS Excel spreadsheet. This sheet assists in performing detailed cost estimate, and reviewing the estimate. The paper also presents a methodology for generating cash flow and required payments. This methodology depends on integrating the developed program with 4D feature of BrIM.
No takes yet. Share an insight, caveat, or question.
Marzouk et al. (2012) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: