Answers are grounded in this paper and cite their sources.
This paper summarizes the results of a study on improvement in the Volt/ Var Optimization (VVO) capabilities due to Advanced Metering Infrastructure (AMI) in comparison with a currently operating advanced VVO application that does not use the AMI. The potential incremental VVO benefits attributable to AMI implementation are detailed based on a utility's prospect.
No takes yet. Share an insight, caveat, or question.
Markushevich et al. (2011) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: